Ground Breaking Carmony


Oylz Terminals AD is proud to be an integral part of this vital energy ecosystem, supported by AD Ports. The company remains committed to strengthening the region’s logistics and storage infrastructure through the delivery of safe, efficient, and sustainable terminal operations, contributing to Abu Dhabi’s long-term energy and trade objectives.

Key project facts

  • Location: Khalifa Port, Abu Dhabi, United Arab Emirates
  • Phase 1 capacity: 154,500 cubic meters
  • Total capacity: 660,000 cubic meters
  • Products: gasoline, gas oil (diesel), naphtha, bunker fuels
  • New dedicated jetty: 16-metre depth, being established for petroleum product-related operations
  • Indicative construction timeline: 18–24 months to commissioning

Gallery

Leave a Comment

Your email address will not be published. Required fields are marked *